Proven Track Record of Excellence
We meet expectations through systems, standards, and sharp execution.
Where We've Featured.
At Sanfranco Global Services Company Limited, our track record demonstrates excellence. We have partnered with leading oil and gas engineering firms to deliver high-quality, safe, and efficient solutions for some of the industry’s most prominent operators. Every project underscores our unwavering commitment to precision, regulatory compliance, and client satisfaction.
| Project Name | Project Location | Contractor / Subcontractor | Client | Duration | Status |
|---|---|---|---|---|---|
| 36″X 23.3 KM EPC Assa North–Ohaji South OB3 CTMS Gas Pipeline Project | Obiafu, Obrikom, Omoku | Oilserv Ltd / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NNPC | Aug 2020 – Present | Ongoing |
| 2″4″6″8″12″&16″ FYIP Estuary Bulkline to South Bank Flow Station | Estuary Flow Station | Michharry / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Jul 2020 | Completed |
| Forcados Estuary PSBR6 Intervention & Surge Vessel Modification | Estuary Flow Station | Gramen Petroserv Nig. Ltd / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Dec 2019 – Jan 2020 | Completed |
| 36″X19.05mm / 36″X22.23mm Lekki Gas Pipeline Project (Section D) | Lekki Free Zone | Safety 2000 / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Dangote Fertilizer Plant | Jul 2019 – Dec 2019 | Completed |
| 36″X19.05mm / 36″X22.23mm Lekki Gas Pipeline Project (Section A) | Mojoda | Zakhem / Torch Energy / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Dangote Fertilizer Plant | Sep 2018 – Dec 2019 | Completed |
| 48″ DORC / EIL Trading Facility Composite Works Pipeline (UG) | Ubeji, Lekki | Omiti Engineering FZE / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Dangote Oil Refinery | May 2018 – Jul 2018 | Completed |
| 30″ Escravos Export System Project | Escravos | Gramen Petroserv Nig. Ltd / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Chevron | Oct 2017 – Feb 2018 | Completed |
| 2″6″8″10″12″&16″ UPS Installation for Utorogu, Osioka & Ughelli LACT Units | Ughelli East | A&N Engineering / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC | Sep 2016 – Oct 2016 | Completed |
| 20″ WRPC Emergency Construction of Crude Pipeline (Jetty → Tank Farm) | Warri | Zakhem Engineering / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
WRPC | Sep 2016 – Dec 2016 | Completed |
| 6″ Utorogu Sectional Replacement Well 35 & Leak Repair Well 32 Flow Line | Utorogu | Hensteel / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC | Aug 2016 – Sep 2016 | Completed |
| 4″ Emergency Leak Repair Sectional Replacement Well 28 Flow Line | Sapele West | NALD’S / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SEPLAT | Jul 2016 – Aug 2016 | Completed |
| 4″ Jones Creek Flow Station Revamp | Jones Creek | Lee Engineering / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC | Dec 2015 | Completed |
| 2″4″&6″ WL 31 Tango Hook Up Arm’s Fabrication | Ughelli East | Afotech / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC | Dec 2015 | Completed |
| 3″ Escravos WL 15 Lima & Serial Hook Up Arm’s Adjustment | Escravos | Hensteel / Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Nov 2015 | Completed |
| 4″ Awoba Construction & Installation of Well Head (Serial & Lima) | Awoba, Rivers State | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Newcross Exploration Production / Offshore Dimension | Sep 2015 – Oct 2015 | Completed |
| 2″ & 4″ Jones Creek Flow Station Revamp Upgrade | Jones Creek | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC / Lee Engineering | Sep 2015 | Completed |
| 6”, 8”, 10”, 12” Utorogu Performance Improvement | Utorogu | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC / Makon | Nov 2014 | Completed |
| Utorogu Domgas Nag-2 Project & Performance Improvement (multi-size lines) | Utorogu | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC / Makon | Oct 2014 | Completed |
| 4″ Opukushi WL34 Serial Flowline | Opukushi | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / Bensegba Technical Company Ltd | Aug – Sep 2014 | Completed |
| Construction of Petroleum Storage Tank | Atlas Cove, Lagos | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC / Adano Engineering & Technical Services | Jun 2014 | Completed |
| 4″ Bensede Sectional Replacement | Bensede | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / Afotech | May 2014 | Completed |
| 6” Okporhuru Bulkline WL3s (Oben) | Oben | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Seplat / McLarTech | Nov 2013 | Completed |
| Construction & Rehabilitation of Petroleum Storage Tanks | Mosimi, Ogun State | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC / Adano Engineering & Technical Services | Aug 2013 | Completed |
| 2″ Utorogu Performance Improvement | Utorogu | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / Makon | Jul 2013 | Completed |
| Utorogu Domgas Nag-2 Project (multi-size flowlines) | Utorogu | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / Makon | Jun – Jul 2013 | Completed |
| Okpurhuru WL1 Lime & Serial Bulkline Construction | Okpurhuru–Oben | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Seplat / Anotech | May 2013 | Completed |
| 4″ Oben Construction Flowline | Oben | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Seplat / McLarTech | Jan – Feb 2013 | Completed |
| 2″ Amukpe Flow Station — Instrument Gas → Air Conversion | Amukpe–Sapele | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Seplat | Nov 2012 | Completed |
| 24″ Forcados Terminal — Minor Intervention Works | Forcados | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / Baywool | Oct 2012 | Completed |
| 18″ South Bank Oil Pipeline from SBFS to NBFS | Forcados | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / OPI | Sep 2012 | Completed |
| 8″ Forcados–Yokri Integrated Project (Flare down offshore works) | Forcados (Offshore) | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / OPI | Jul – Aug 2012 | Completed |
| 30″ Sapele AN/ZK Flowline & NGC Pipeline Sections 5–7 | Sapele | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NGC / Anotech / Zarchem | Oct – Dec 2011 | Completed |
| 6” Utorogu New 1km Well 28T Flowline & 1km Inhibitor Line | Utorogu | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / Bensegba | Feb – Apr 2011 | Completed |
| Benisede RV Discharge Upgrade | Benisede, Bayelsa State | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Jan 2011 | Completed |
| Ughelli East Asset Integrity & Brownfield Works (2″–6″ lines) | Ughelli East | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / Lee Engineering | Dec 2010 | Completed |
| 4″ Escravos Flowline Replacement WL11 Seria / 6 Tango | Escravos | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Nov 2010 | Completed |
| 2″ Sectional Replacement Kokori WL 4 Gas Lift Line | Kokori | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Oct 2010 | Completed |
| Owhe AOC — 4″ & 2–4″ COC Gas Line Spools (Multiple works) | Owhe | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NGC | Jul – Sep 2010 | Completed |
| 4″ Ogini WL 4T Flowline Sectional Replacement | Ogini | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Jun 2010 | Completed |
| 2” – 10” Utorogu Gas Line Sectional Replacement | Utorogu | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | May 2010 | Completed |
| 6” Tunu Kanbo Replacement of Vandalized Flow Line (WL 6T / 4L / 7S) | Tunu, Bayelsa | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC / Lurine / NEMEBREM | Jan – Apr 2010 | Completed |
| Oben (Benin City) — 3”, 4” & 6” Nag Line WL 29 / WL 38 / WL 17 | Oben | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Oct – Nov 2009 | Completed |
| EGP-3 Phase 3 | Escravos | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
Chevron / Hyundai Heavy Industries (HHI) | Oct 2009 | Completed |
| 2” Olomoro / Oleh — Instrument Gas to Air Conversion | Olomoro / Oleh | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Sep 2009 | Completed |
| 4” Oredo Benin WL 7 Seria & 3 Lima Flowline | Oredo, Benin | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
NPDC | Jul – Aug 2009 | Completed |
| 4” Olomoro / Oleh Sectional Replacement (Stolen Line replacement) | Oleh | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | May – Jun 2009 | Completed |
| Owhe — Sectional Replacement of Stolen WL 8, WL 11, WID, GLLW 35 Flow Line | Isoko (Owhe) | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Apr 2009 | Completed |
| Sapele West — WL 17 & WL 18 Flowline Replacement | Sapele West | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Feb – Mar 2009 | Completed |
| Afiesere Ughelli — 2” Gas Line Sectional Replacement | Ughelli | Ozma Nig. Co. Ltd (Sanfranco personnel featured) |
SPDC | Dec 2008 – Jan 2009 | Completed |