Sanfranco Global Services Company Limited

Proven Track Record of Excellence

We meet expectations through systems, standards, and sharp execution.

Where We've Featured.

At Sanfranco Global Services Company Limited, our track record demonstrates excellence. We have partnered with leading oil and gas engineering firms to deliver high-quality, safe, and efficient solutions for some of the industry’s most prominent operators. Every project underscores our unwavering commitment to precision, regulatory compliance, and client satisfaction.

 
Project Name Project Location Contractor / Subcontractor Client Duration Status
36″X 23.3 KM EPC Assa North–Ohaji South OB3 CTMS Gas Pipeline Project Obiafu, Obrikom, Omoku Oilserv Ltd / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NNPC Aug 2020 – Present Ongoing
2″4″6″8″12″&16″ FYIP Estuary Bulkline to South Bank Flow Station Estuary Flow Station Michharry / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Jul 2020 Completed
Forcados Estuary PSBR6 Intervention & Surge Vessel Modification Estuary Flow Station Gramen Petroserv Nig. Ltd / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Dec 2019 – Jan 2020 Completed
36″X19.05mm / 36″X22.23mm Lekki Gas Pipeline Project (Section D) Lekki Free Zone Safety 2000 / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Dangote Fertilizer Plant Jul 2019 – Dec 2019 Completed
36″X19.05mm / 36″X22.23mm Lekki Gas Pipeline Project (Section A) Mojoda Zakhem / Torch Energy / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Dangote Fertilizer Plant Sep 2018 – Dec 2019 Completed
48″ DORC / EIL Trading Facility Composite Works Pipeline (UG) Ubeji, Lekki Omiti Engineering FZE / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Dangote Oil Refinery May 2018 – Jul 2018 Completed
30″ Escravos Export System Project Escravos Gramen Petroserv Nig. Ltd / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Chevron Oct 2017 – Feb 2018 Completed
2″6″8″10″12″&16″ UPS Installation for Utorogu, Osioka & Ughelli LACT Units Ughelli East A&N Engineering / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC Sep 2016 – Oct 2016 Completed
20″ WRPC Emergency Construction of Crude Pipeline (Jetty → Tank Farm) Warri Zakhem Engineering / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
WRPC Sep 2016 – Dec 2016 Completed
6″ Utorogu Sectional Replacement Well 35 & Leak Repair Well 32 Flow Line Utorogu Hensteel / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC Aug 2016 – Sep 2016 Completed
4″ Emergency Leak Repair Sectional Replacement Well 28 Flow Line Sapele West NALD’S / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SEPLAT Jul 2016 – Aug 2016 Completed
4″ Jones Creek Flow Station Revamp Jones Creek Lee Engineering / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC Dec 2015 Completed
2″4″&6″ WL 31 Tango Hook Up Arm’s Fabrication Ughelli East Afotech / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC Dec 2015 Completed
3″ Escravos WL 15 Lima & Serial Hook Up Arm’s Adjustment Escravos Hensteel / Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Nov 2015 Completed
4″ Awoba Construction & Installation of Well Head (Serial & Lima) Awoba, Rivers State Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Newcross Exploration Production / Offshore Dimension Sep 2015 – Oct 2015 Completed
2″ & 4″ Jones Creek Flow Station Revamp Upgrade Jones Creek Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC / Lee Engineering Sep 2015 Completed
6”, 8”, 10”, 12” Utorogu Performance Improvement Utorogu Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC / Makon Nov 2014 Completed
Utorogu Domgas Nag-2 Project & Performance Improvement (multi-size lines) Utorogu Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC / Makon Oct 2014 Completed
4″ Opukushi WL34 Serial Flowline Opukushi Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / Bensegba Technical Company Ltd Aug – Sep 2014 Completed
Construction of Petroleum Storage Tank Atlas Cove, Lagos Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC / Adano Engineering & Technical Services Jun 2014 Completed
4″ Bensede Sectional Replacement Bensede Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / Afotech May 2014 Completed
6” Okporhuru Bulkline WL3s (Oben) Oben Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Seplat / McLarTech Nov 2013 Completed
Construction & Rehabilitation of Petroleum Storage Tanks Mosimi, Ogun State Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC / Adano Engineering & Technical Services Aug 2013 Completed
2″ Utorogu Performance Improvement Utorogu Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / Makon Jul 2013 Completed
Utorogu Domgas Nag-2 Project (multi-size flowlines) Utorogu Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / Makon Jun – Jul 2013 Completed
Okpurhuru WL1 Lime & Serial Bulkline Construction Okpurhuru–Oben Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Seplat / Anotech May 2013 Completed
4″ Oben Construction Flowline Oben Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Seplat / McLarTech Jan – Feb 2013 Completed
2″ Amukpe Flow Station — Instrument Gas → Air Conversion Amukpe–Sapele Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Seplat Nov 2012 Completed
24″ Forcados Terminal — Minor Intervention Works Forcados Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / Baywool Oct 2012 Completed
18″ South Bank Oil Pipeline from SBFS to NBFS Forcados Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / OPI Sep 2012 Completed
8″ Forcados–Yokri Integrated Project (Flare down offshore works) Forcados (Offshore) Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / OPI Jul – Aug 2012 Completed
30″ Sapele AN/ZK Flowline & NGC Pipeline Sections 5–7 Sapele Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NGC / Anotech / Zarchem Oct – Dec 2011 Completed
6” Utorogu New 1km Well 28T Flowline & 1km Inhibitor Line Utorogu Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / Bensegba Feb – Apr 2011 Completed
Benisede RV Discharge Upgrade Benisede, Bayelsa State Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Jan 2011 Completed
Ughelli East Asset Integrity & Brownfield Works (2″–6″ lines) Ughelli East Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / Lee Engineering Dec 2010 Completed
4″ Escravos Flowline Replacement WL11 Seria / 6 Tango Escravos Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Nov 2010 Completed
2″ Sectional Replacement Kokori WL 4 Gas Lift Line Kokori Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Oct 2010 Completed
Owhe AOC — 4″ & 2–4″ COC Gas Line Spools (Multiple works) Owhe Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NGC Jul – Sep 2010 Completed
4″ Ogini WL 4T Flowline Sectional Replacement Ogini Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Jun 2010 Completed
2” – 10” Utorogu Gas Line Sectional Replacement Utorogu Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC May 2010 Completed
6” Tunu Kanbo Replacement of Vandalized Flow Line (WL 6T / 4L / 7S) Tunu, Bayelsa Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC / Lurine / NEMEBREM Jan – Apr 2010 Completed
Oben (Benin City) — 3”, 4” & 6” Nag Line WL 29 / WL 38 / WL 17 Oben Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Oct – Nov 2009 Completed
EGP-3 Phase 3 Escravos Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
Chevron / Hyundai Heavy Industries (HHI) Oct 2009 Completed
2” Olomoro / Oleh — Instrument Gas to Air Conversion Olomoro / Oleh Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Sep 2009 Completed
4” Oredo Benin WL 7 Seria & 3 Lima Flowline Oredo, Benin Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
NPDC Jul – Aug 2009 Completed
4” Olomoro / Oleh Sectional Replacement (Stolen Line replacement) Oleh Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC May – Jun 2009 Completed
Owhe — Sectional Replacement of Stolen WL 8, WL 11, WID, GLLW 35 Flow Line Isoko (Owhe) Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Apr 2009 Completed
Sapele West — WL 17 & WL 18 Flowline Replacement Sapele West Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Feb – Mar 2009 Completed
Afiesere Ughelli — 2” Gas Line Sectional Replacement Ughelli Ozma Nig. Co. Ltd
(Sanfranco personnel featured)
SPDC Dec 2008 – Jan 2009 Completed